Shanghai Oriental Sports Center | gmp architekten

The Shanghai Oriental Sports Center (SOSC) is a sports complex on the Huangpu River in Shanghai, designed by gmp (von Gerkan, Marg and Partners) after a 2008 competition and opened for the 14th FINA World Championships in July 2011. It brings together a multi-purpose hall stadium, an indoor natatorium, an outdoor diving and swimming venue and a media centre, all set in artificial lakes on former industrial land. This case study is for students and designers: it gives verified project facts, a short reading of the design idea and the plan, and the sources to cite.

Project facts

The 2011 championships, the world aquatics event organised by FINA (now World Aquatics), ran from 16 to 31 July 2011, and the complex was built in under two and a half years from the competition win, according to gmp’s project text as published by Dezeen in July 2011. The client was the Shanghai Administration of Sport. The roof structures were engineered with schlaich bergermann partner (sbp), which lists the project among its sports buildings.

Shanghai Oriental Sports Center: key facts
Venue / item Key data (gmp project text)
Competition / completion Competition won 2008; opened July 2011 (built in under 2.5 years)
Opening event 14th FINA World Championships, 16-31 July 2011
Hall stadium Round plan; steel roof span 170 m; 14,000 seats, 18,000 with mobile seating
Natatorium 4 pools in a row; roof c. 210 x 120 m, 22 m high; 3,500+ fixed seats, 5,000 in 2011
Outdoor pool Diving and competition pools; ring roof c. 130 m outer / 90 m inner diameter; 2,000 fixed seats, up to 5,000
Media centre 80 m, 15 storeys; 8.4 m grid; perforated white aluminium skin
Client Shanghai Administration of Sport

Source: gmp architekten project text (via Dezeen/ArchDaily, July 2011) (as of 30 October 2026).

Design idea in one paragraph

Water is the organising theme of the Shanghai Oriental Sports Center. The sports centre was built on brownfield land along the Huangpu, and the architects dug lakes across the site so that each building stands on a raised platform surrounded by water: the round venues have curved shorelines, the rectangular natatorium a straight one. All three stadiums share one structural language: broad steel arches clad with large triangular panels of coated aluminium, forming double-curved surfaces that gmp compares to sails in the wind. The shared form and materials make three very different buildings read as one ensemble, and the venues were planned from the start for other uses after the championships.

Schematic site plan beside the Huangpu River with three venues on platforms in lakes, round venues with curved shores and a rectangular natatorium

Water as the organising idea at the Shanghai Oriental Sports Center: lakes dug across the riverside site leave each venue on a raised platform surrounded by water, with curved shorelines around the round venues and a straight one along the rectangular natatorium. Diagram: Arch2O

Plan and section analysis

Hall stadium

The hall stadium has a round plan with a reinforced concrete main structure and a steel roof spanning 170 m, clad in aluminium. Parallel steel girders form 35 m high arcades around an encircling foyer with glass facades. During the 2011 championships it hosted pool events and synchronised swimming; afterwards it was designed for basketball, ice hockey, boxing, badminton and concerts. gmp gives its capacity as 14,000 seats, rising to 18,000 with mobile seating.

Shanghai Oriental Sports Center – gmp architekten

photography by © Marcus Bredt

The design lesson is the separation of a permanent bowl from a temporary event fit-out: the aquatic championships were the opening use, not the long-term programme.

Natatorium

The natatorium is a closed, rectangular building with four pools in a row: two competition-size pools, a diving pool and a leisure pool. Its roof of steel section girders with triangular glass panels is about 210 m long, 120 m wide and 22 m high. Narrow rooflights run along the beams so that the hall receives daylight without direct sun falling on the water, which reduces glare on the water surface. gmp’s text gives more than 3,500 fixed seats, expanded to 5,000 for the championships to meet FINA requirements.

Shanghai Oriental Sports Center – gmp architekten

photography by © Marcus Bredt

Inside, the glazed roof spans the full length of the pool hall, with the spectator stands along the long sides and the diving pool at one end.

Shanghai Oriental Sports Center – gmp architekten

photography by © Marcus Bredt

Outdoor pool

The outdoor venue stands on its own artificial island with a competition-size diving pool and diving towers next to a competition pool. Its ring-shaped roof, about 130 m in outer diameter and 90 m inner diameter, follows the round plan of the grandstands. The roof trusses cantilever from the building structure, and a lightweight membrane between them shades spectators from sun and rain. gmp gives 2,000 fixed seats, raised to 5,000 for major events.

Shanghai Oriental Sports Center – gmp architekten

photography by © Marcus Bredt

Media centre

On the north side of the complex an 80 m, 15-storey building holds a fitness centre, conference rooms, a medical centre, VIP areas and offices. An even 8.4 m structural grid keeps the floors flexible for changing uses. Its outer skin of white perforated aluminium panels is shaped in waves that echo the edge of the adjacent lake.

Shanghai Oriental Sports Center hall stadium with white sail-like ribs across its lake, the media centre tower at left

The hall stadium seen across its lake, with the white perforated media centre tower on the left. Photo: 钉钉, CC BY-SA 4.0, via Wikimedia Commons. 钉钉, source, CC BY-SA 4.0

Context and reading

The Shanghai Oriental Sports Center belongs to a series of large sports projects that gmp completed around 2010-2012, alongside its stadium work for the 2012 UEFA European Championship in Warsaw and Kyiv. Compared with a single-stadium commission, the interest here is the urban strategy: four buildings on reclaimed industrial land tied together by landscape and water, with venue sizes chosen for life after a two-week championship. Readers comparing precedents should look at how the hall stadium’s mobile seating and the natatorium’s split between fixed and temporary seats were used to fit one event without oversizing the permanent buildings.

Project credits

Architects: gmp architekten (von Gerkan, Marg and Partners)
Location: Shanghai, China
Design: Meinhard von Gerkan and Nikolaus Goetze with Magdalene Weiss
Project leader: Chen Ying
Team: Jan Blasko, Lü Cha, Lü Miao, Jörn Ortmann, Sun Gaoyang, Yan Lüji, Jin Zhan, Fang Hua, Martin Friedrich, Fu Chen, Ilse Gull, Kong Rui, Lin Yi, Katrin Löser, Ren Yunping, Alexander Schober, Nina Svensson, Tian Jinghai, Zhang Yan, Zhou Yunkai, Zhu Honghao
Structural engineering (roofs): schlaich bergermann partner
Client: Shanghai Administration of Sport
Completed: 2011
Type: Sports centre
Photographs: Marcus Bredt

Sources and further reading

  • gmp architekten, project text for the Shanghai Oriental Sports Center, as published by ArchDaily and Dezeen (July 2011).
  • schlaich bergermann partner, project listing for SOSC.
  • 2011 World Aquatics Championships, overview of the event and venues.