House of Traditions in Simala | Martino Picchedda

House of Traditions in Simala, Nestled in the heart of Sardinia, 45 kilometers from Oristano, the small agricultural and pastoral village of Simala preserves a profound connection between past and future. At its core lies a remarkable architectural intervention—a project that embraces the poetics of ruins while celebrating their symbolic value.

© Cédric Dasesson1

© Cédric Dasesson

Curated by the young architect Martino Picchedda, this initiative demonstrates how a sensitive and contemporary approach can transform historic structures into catalysts for social and cultural regeneration.

© Cédric Dasesson2

© Cédric Dasesson

A XIX-Century Legacy Reimagined

© Cédric Dasesson3

© Cédric Dasesson

At the heart of Simala, a 19th-century courtyard building—once the residence of a landowner and the center of agricultural activity—has been reimagined as a public exhibition space. Respectfully interpreting the passage of time, the project views architectural traces as layered narratives, weaving memory into the fabric of modernity.

© Cédric Dasesson4

© Cédric Dasesson

Rediscovering Ruins: The Evocative Power of Decay

© Cédric Dasesson5

© Cédric Dasesson

The intervention begins with a delicate process of unveiling. Overgrown vegetation and decades of dust are removed, not as mere functional acts but as symbolic gestures, revealing the latent potential of the site. The ruins, previously seen as relics, become the focal point of the design, telling stories through their enduring presence. Surviving walls, though fragile, gain a theatrical presence, framing the public space like stage sets. These ruins define an open void—a space that invites rather than excludes, a threshold between the intimate and the communal.

© Cédric Dasesson6

© Cédric Dasesson

An Architecture of Memory and Landscape

© Cédric Dasesson7

© Cédric Dasesson

The project draws inspiration from masters who grappled with historical preexistence, such as the visionary drawings of Piranesi and the material poetry of Alberto Burri’s Gibellina. In the courtyard, the traditional “impedrau” paving pays homage to the tactile memory of Sardinian courtyards. Indoors, basalt flooring laid with wide joints on a draining bed captures and channels water through an intricate network of pipes. Fragments of the original stone tiles, or “tellas”, are thoughtfully reintegrated, weaving continuity into the narrative of the space.

© Cédric Dasesson8

© Cédric Dasesson

A Stage for Community Life

© Cédric Dasesson9

© Cédric Dasesson

The courtyard, once a private agricultural space, now unfolds as a public exhibition plaza. The minimalist interventions serve the historical architecture, highlighting the raw materiality of the walls treated with ecological lime-based plaster. The ruins, cleaned and consolidated, wear their incompleteness proudly. Their simple, timeworn surfaces recount stories of labor, resilience, and daily life. This space becomes a metaphor for a Sardinia that acknowledges its roots while embracing renewal, bridging the past and future seamlessly.

© Cédric Dasesson10

© Cédric Dasesson

An Intervention Between Art and Landscape

© Cédric Dasesson14

© Cédric Dasesson

The project’s poetic essence lies in its simplicity. It focuses on materials, memory, and the ability of space to awaken latent collective emotions. The result is a meeting place—a stage where history and contemporaneity coexist, dedicated to showcasing local products and promoting slow tourism, increasingly vital to Simala’s economic and cultural dynamics.

© Cédric Dasesson12

© Cédric Dasesson

This intervention embodies an architecture that listens rather than dominates. Through this project, Simala emerges as a living laboratory of territorial regeneration—a testament to how architecture can reinterpret memory to craft an open and shared narrative.

Project Info
Architects: Martino Picchedda
Country: Italy
Area: 500 m²
Year: 2024
Photographs: Cédric Dasesson
Construction Supervision: Arch. Martino Picchedda
Client: Municipality of Simala – Unione Comuni Parte Montis
Project Co Funding: Municipality of Simala, RAS Territorial Development Project (PST)
Construction Costs: €145,000
Total Project Cost: €250,000

Madeline Brooks
Show full profile Madeline Brooks

Madeline Brooks is a Projects Editor at Arch2O, where she has been shaping and refining architectural content since March 2024. With over a decade of experience in editorial work, she has curated, revised, and published an array of projects covering architecture, urbanism, and public space design. A graduate of the Harvard University Graduate School of Design, Madeline brings a strong academic foundation and a discerning editorial eye to each piece she oversees. Since joining Arch2O, she has played a pivotal role in shaping the platform’s editorial direction, with a focus on sustainability, social relevance, and cutting-edge design. Madeline excels at translating complex architectural ideas into clear, engaging stories that resonate with both industry professionals and general readers. She works closely with architects, designers, and global contributors to ensure every project is presented with clarity, depth, and compelling visual narrative. Her editorial leadership continues to elevate Arch2O’s role in global architectural dialogue.

Arch2O.com
Logo
Shopping cart