East Parking Building of Sanya Phoenix International Airport | Jing Studio

Designed by Jing Studio, The project is located at the eastern end of the airport area, with a main road to the north, a internal road to the south, and facing the new-build complex building to the west,the T3 terminal building to the south. The tusk is to solve the current traffic congestion as well as to expand parking spaces. Due to the growing traffic pressure, the complex building and the parking building are urgently demanded.

Photography by © Chao Zhang

Traffic solution
The plan is to build six-story volume considering the future passenger capacity, building code and parking efficiency. In order toestablish an effective traffic circulation, the building volumes are elevated and connected on the second floor, which release a continuous ground floor space for organizing and dredging functional traffics such us taxis, buses, social vehicles, logistics vehicles etc. The building volume also setback to the airport road on the south side, expanding the length of the lane to meet the needs of the drop off interface.

Photography by © Chao Zhang

Strategy
It took only four months for the construction of the main structure, and two month in use later. As the building was under a limited cost and time, the overall design strategies are as follows: none basement, integrated facade and structure, architecture as landscape.
The soil of the site is mainly coarse sand and sandy clay, which has good bearing capacity and can be used as a natural foundation. The building floors are all above ground, and the structure uses an independent column foundation, to avoid the excavation of the basement.
The edge of the slab is thickened to form a flower pond, combined structure and building envelope; the arrangement of the flower pool is arranged in a patchwork manner, creating a vertical greenery for the parking space, and also decorate the building itself as opposite scenery for other buildings.
Using innovative construction processes such as bare concrete and external paint, the building had achieved a decent quality with a limited budget. After the early running-in in the construction of the complex building, the team cooperates skillfully, witch results in a high planarity of the cast-in-place concrete which can achieve fine facade effect through simple brushing.

Elevation Perspective

Climate
The double-layer flower pool resists the direct sunlight while provides good ventilation, creating a cool shade area; the abundant soil depth insurances the daily encirclement of the green plant with simple irrigation system, bringing a continuous landscaping to the monotonous parking floor. By inducing nature into the space, created a semi-outdoor functional building, adapt to the tropical maritime climate of Sanya.

CadPhotography by © Tian Mai

Project Info:
Architects: Jing Studio
Location: China
Area: 44906.0 m²
Year: 2018
Photographs: Chao Zhang, Tian Mai
Project Name: East Parking Building of Sanya Phoenix International Airport

 

Arch2O.com
Logo
Send this to a friend