CAI Athletic Pavilion, The building holds indoor athletic activities such as 100m race or long jump and is used mostly in cold seasons to warm up and avoid injuries of the athletes.
The shape of the building is defined by the footprint of the plot, the streetwalk on one side and the athletic stadium and track on the other, while entrances are located on both short sides. The metal structure is designed with Fink trusses painted in white, that help optimize structural elements, to cover the whole space, varying from 10 to 19 meters long.
The concrete walls are due for vandalism and to avoid external-internal visual connection for distractions, and the polycarbonate elements offer a filtered natural light and create an illuminated landmark at night.
Project Info
Architects: GAP Associates
Country: Spain, Igualada
Area: 835 m²
Year: 2018
Photographs: Jesús Arenas Mesa
Construction: Grupo Ravi
Structure: GAP Associates
Quantity Surveyor/Technical Architect: Jordi Marín
Mep Engineering: Acosta Enginyers
Author Architects: Albert Albareda Valls, Carles Pastor Foz
Design Team: Ramon Corrochano, Alejandro Tomás Arolo, Eudald Pedrós Reig












