Aware of the challenges linked to the construction of the new Omnisport hall (predominantly basketball) and the renovation and extension of the existing gym, our project aims to respond to the programmatic expectations and proposes quality spaces for sportsmen, be they amateur, professionals, scholars, or spectators.
Following the programmatic, environmental, and economical demands, the project uses architectural and technical solutions aiming to master those constraints.
Particular attention has equally been paid to future investments linked to the maintenance of equipment.
Project Info
Architects: BPA ARCHITECTURE
Area: 2964 m²
Year: 2020
Manufacturers AutoDesk, AIRSUN, Arcelor Mittal, Autodesk Revit, EVERLITE, MARTY SPORTS, ST GROUP: AutoDesk
Category: Recreation & Training
Associate Architect: Renaud Fabre
Roads And Utilities: SEIRI
Acoustic Engineer: Gui Jourdan
Fluids Engineer: P3G INGENIERIE
City: Castelnau-le-Lez
Country: France










Nora is an architect and editor with a degree from Pratt Institute. She bridges design practice and architectural criticism, documenting contemporary urban transformations through compelling visual narratives.
