Construction Update of Reading Station Area Redevelopment by Grimshaw Architects
Grimshaw’s design reduces the number and complexity of construction operations on the platforms and over the tracks, ensuring that the station could be built within an operational rail environment. The largest element of construction is the station transfer deck, a 30m wide 135m long bridge, built on the north side of the station and launched over the tracks. Grimshaw worked with specialist fabricators to develop a modular canopy system which uses prefinished, factory-assembled cassette panels, with bespoke curved sections to form the sinuous, canopy ribbons that shape the station environment. The design also incorporates a Grade 2 listed structure, and a public thoroughfare beneath the station.Go read more here
Project info :
Project : Reading Station
Location : Reading, UK
Client : Network Rail / Tata Steel
Size : 15,000 sq m



Tags: GrimshawGrimshaw ArchitectsGrimshaw firmLondonreadingReading Station AreaRedevelopmentStationUK
Ibrahim Abdelhady is an architect, academic, and media entrepreneur with over two decades of experience in architecture and digital publishing. He is the Founder and CEO of Arch2O.com, a leading platform in architectural media, renowned for showcasing innovative projects, student work, and critical discourse in design. Holding dual PhDs in Architecture, Dr. Abdelhady combines academic rigor with industry insight, shaping both future architects and architectural thought. He actively teaches, conducts research, and contributes to the global architecture community through his writing, lectures, and media ventures. His work bridges the gap between practice and academia, pushing the boundaries of how architecture is communicated in the digital age.


