Ca na Baldu i en Diego | Atzur arquitectura

Ca na Baldu i en Diego involves the renovation of a single-family home located at the foot of Tibidabo, in the Sarrià – Sant Gervasi district.

© Del Rio Bani1

© Del Rio Bani

The original construction is essentially an addition of volumes of various natures with unequal heights. The proposal aims to unify the volumes, making the most of the richness and diversity presented by the current state through a precise and detailed structural exercise.

© Del Rio Bani3

© Del Rio Bani

In terms of distribution, the original state features very compartmentalized spaces with dimensions that are not suitable for their intended use. Furthermore, this excessive compartmentalization means that these rooms do not have adequate lighting and ventilation.

© Del Rio Bani4

© Del Rio Bani

Ca na Baldu i en Diego seeks to create spaces that take advantage of natural light and ventilation, allowing for diverse and flexible uses. All of this while preserving the traces of what existed before the intervention.

Project Info
Architects: Atzur Arquitectura
Country: Spain, Barcelona
Area: 180 m²
Year: 2025
Photographs: Del Rio Bani

Mohamed Saleh
Arch2O.com
Logo